lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. ut enim ad minim veniam, quis nostrud exercitation ullamco llorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et.
As per AS1851. Weekly, Monthly, Quarterly, 3 Monthly, 6 Monthly, Annual.
Fire Panels
EWIS
Emergency Lighting
Fire Doors
Fire Penetrations
Sprinkler Systems
Hydrant Systems
Hose Reels
Sound Pressure Level Testing
Flow Testing
Evacuation planning training as per AS3745
Building Emergency Procedures and Equipment and operation Training
Online Course & Examination for each of your employees for documentation
New Employees can easily be given a login to take the course as part of your standard procedures.
Designs for new buildings or office floors to meet compliance with the BCA & Relevant Australian Standards
Multiple Design Options to suit your operational and budget requirements
Installations done to a consultant specification
Spinkler Systems, Fire Control Panels, FM200, VESDA, & Ewis Panels.
Egress / Evacuation Plans & Maps, Checking system operational requirements to current building layout and code requirements
Checking current manufacturer supported status of equipment such as Fire Indicator Panels & suggesting upgrade paths and planning
Planning for relocates, upgrades, and replacement of defective equipment
Inspecting current system working order including the accessibility/serviceability/economical operation setup of the field equipment
Pressure testing, flow testing.